Impact score
5/10
Urgency
phased
Sections
1
Primary agencies
Key terms
Directs the Secretary of Commerce to develop a plan within 180 days requiring that all new, retrofitted, repaired, or expanded pipelines within U.S. borders use American-produced materials and equipment to the maximum extent possible. Defines 'Produced in the United States' with strict criteria for iron and steel products, requiring all manufacturing processes from initial melting through coating to occur domestically, and excluding products made from foreign semi-finished steel.
( printed page 8659) Memorandum of January 24, 2017 Construction of American Pipelines Memorandum for the Secretary of Commerce The Secretary of Commerce, in consultation with all relevant executive departments and agencies, shall develop a plan under which all new pipelines, as well as retrofitted, repaired, or expanded pipelines, inside the borders of the United States, including portions of pipelines, use materials and equipment produced in the United States, to the maximum extent possible and to the extent permitted by law. The Secretary shall submit the plan to the President within 180 days of the date of this memorandum. “Produced in the United States” shall mean: (i) With regard to iron or steel products, that all manufacturing processes for such iron or steel products, from the initial melting stage through the application of coatings, occurred in the United States. (ii) Steel or iron material or products manufactured abroad from semi-finished steel or iron from the United States are not “produced in the United States” for purposes of this memorandum. (iii) Steel or iron material or products manufactured in the United States from semi-finished steel or iron of foreign origin are not “produced in the United States” for purposes of this memorandum. The Secretary of Commerce is hereby authorized and directed to publish this memorandum in the Federal Register. THE WHITE HOUSE, Washington, January 24, 2017 [ FR Doc. 2017-02031 Filed 1-27-17; 8:45 am] Billing code 3510-07-P
Get automated GovCon impact analysis for every new executive order. HARBOR Federal Signal monitors federal policy changes and explains what they mean for your contracts, NAICS codes, and compliance requirements.
Run your free Federal Signal →Analysis on this page is AI-generated from the public Federal Register document and is provided for informational purposes only. It is not legal advice. Always verify against the source document.